Resource Type

Journal Article 262

Year

2023 3

2022 4

2021 10

2020 8

2019 18

2018 18

2017 10

2016 6

2015 5

2014 5

2013 17

2012 31

2011 12

2010 42

2009 38

2008 8

2007 8

2006 5

2005 2

2004 2

open ︾

Keywords

suspension bridge 21

bridge 16

cable-stayed bridge 12

Sutong Bridge 11

Taizhou Bridge 10

Hong Kong-Zhuhai-Macao Bridge 6

bridge engineering 4

dynamic response 4

steel box girder 4

the Fourth Nanjing Yangtze River Bridge 4

EngineeringAchievements 3

FEM 3

Sutong cable-stayed bridge 3

bearing capacity 3

seismic performance 3

BNLAS 2

Beijing-Tianjin inter-city railway 2

Bridge 2

China 2

open ︾

Search scope:

排序: Display mode:

Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge

Wu Shouchang, Xu Yingmei

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 8-13

Abstract: article presents the justification and decision-making of the project plan during the initial stage for SutongBridge, with emphasis on initial stage for Sutong Bridge with respect to the justification of locationof Sutong Bridge, comparison and selection of project plan for the river-crossing main bridge and studies

Keywords: Sutong Bridge     project plan     special research subjects    

Cultivating innovation capability of enterprise is an important task of Sutong Bridge construction

You Qingzhong

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 4-7

Abstract: effective approach to cultivate the core competitiveness of leading enterprises on the basis of practice in SutongBridge.

Keywords: Sutong Bridge     project     innovation     enterprises    

Practice and experience of engineering culture development in Sutong Bridge project

Yu Chunsheng,Yao Bei,Wang Qian

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 92-96

Abstract: backs project management on the basis of thorough investigation of engineering culture development in SutongBridge project and after deepened analysis, proposes new thinking pattern of engineering culture development

Keywords: Sutong Bridge engineering culture     large-scale projects engineering culture development     systematic thinking    

Design and construction of Sutong Bridge twoer

Luo Chengbin,Zhou Jianlin,Tian Wei,Daijie

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 51-56

Abstract:

Sutong Bridge tower with 300.4 m is the highest one in the world, The

Keywords: Sutong Bridge     tower's design and construction    

and construction of scour protection for deep-water group pile foundation structures of two pylons in SutongBridge

He Ping,Guan Yijun,Zhang Xiongwen,Zhang Qun,Zhou Jianhua

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 44-50

Abstract: Starting from structural description of deep-water group pile foundation, the paper analyzed impact to the bridgeprotection and further presentsed different solutions of scour protection for foundation structures of the bridge

Keywords: Sutong Bridge     deep-water group piles     scour protection     design and construction    

Study on stuctural system of Sutong Bridge

Zhang Xigang,Pei Minshan,Yuan Hong,Xu Liping,Zhu Bin

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 20-25

Abstract:

Sutong Bridege, whose layout is ( 100 + 100 + 300 ) + 1 088 + ( 300 +The complex natural condition at thr bridge site and the strict requirements for resistance of wind andaction make it crucial to choose a favorable structural system to addure the funcrion and safety of the bridgeThe comparsion among several optional structural systems for Sutong Bridge is illustrated, the optionalliquid viscous damper with additional displacement limitation is designed for the first application in bridge

Keywords: Sutong cable-stayed bridge     structural system     damper     damper parameter     displacement    

Design and construction of Sutong Bridge deep-water main pylon foundations

Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 38-43

Abstract:

This paper, from three aspects including construction conditions, foundation design and construction, introduces some considerations in the designing of main-pylon foundations and some practical measures to deal with certain unfavorable construction conditions, such as deep water, tidal effect, soft stratum and heavy traffic, during the construction of main-pylon foundations.

Keywords: Sutong Bridge     group-pile foundation     steel cofferdam     scour protection    

The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam

Zhang Xiongwen,Ren Huixing

Strategic Study of CAE 2010, Volume 12, Issue 2,   Pages 22-26

Abstract:

Sutong Bridge is the first cable stayed bridge with the span exceedsThis paper discussed the lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam

Keywords: Sutong Bridge     large steel cofferdam     fabrication     lowering as a whole     synchronousness controlling    

Challenge and Innovation in Sutong Bridge Foundation Proje ct

You Qingzhong,Dong Xuewu,Wu Shouchang

Strategic Study of CAE 2007, Volume 9, Issue 6,   Pages 22-26

Abstract: three outstanding innovations: Utilization of steel casing to establish a construction platform for SutongBridge' s super-large and deep-pile groups ; Permanent collision facilities consisting of collisionThe article also presents economical and reasonable design method for super large bridge foundation and

Keywords: Sutong Bridge     construction platform     steel cofferdam     collision structure     lowering as awhole     permanent    

Assistant pullback technology for main span closure of Sutong Bridge

Chen Ming,Luo Chengbin,Wu Qihe,Zhang Yongtao,You Xinpeng

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 75-80

Abstract:

By abstracting the advantage of the pullback method abroad and the deomestric temperature-cutting method, a new assistant pullback method is put forward and brought into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance are introduced.

Keywords: Sutong Bridge     assistant pullback     middle span closure     geometric control method     construction technology    

Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters

You Qingzhong,He Ping,Dong Xuewu,Zhang Xigang,Wu Shouchang

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 14-19

Abstract:

In this paper, design and construction concepts are briefly presented. Furthermore, key technologies and innovative achievements are summarized mainly on piled foundation bearing capacity analysis, river bed scour protection and monitoring, superstructure wind-resistance study, mid-span closure method as well as long cantilever structure construction control.

Keywords: Sutong cable-stayed bridge     foundation     pylon     steel box girder     cable stay     construction control    

Structural stability analysis of Sutong Yangtze River Highway Bridge during construction

Zhao Lei,Li Qiao,Zhang Hong,BU Yizhi

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 81-84

Abstract:

According to construction and load action on SuTong Yangtze River HighwayBridge, an analysis model for structural stability was studied and solved through FEM.

Keywords: Sutong cable-stayed bridge     construction     structural stability     safety factor     FEM    

Sutong Bridge--construction and control technology of the superstructure

Zhang Hong,Luo Chenbin,Zhang Yongtao,You Xinpeng

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 85-91

Abstract:

Sutong Yangtze Highway Bridge is the longest span cable-stayed bridgeThe construction of superstructure of the main bridge was composed of several stages including erectionand controlled system adapt to each other, the goal to make the final line shape and inner force of bridge

Keywords: Sutong Bridge     superstructure     construction method     construction control     geometry control     wind-resistant    

Research on the special lifting device for steel box girders of Sutong Bridge

Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa

Strategic Study of CAE 2009, Volume 11, Issue 3,   Pages 65-70

Abstract:

Sutong Bridge is a cable stayed bridge with a steel box girder and aDue to the high of navigational clearance of the main bridge, the traditional truss lifting device couldnHence, a kind of lighter lifting device for the erection of back span large units was accepted for this bridgeBecause the bridge's navigation clearance is high, and the girder segment is wide and heavy, themeteorology and hydrology condition of the bridge district is abominable, and the requirements of long

Keywords: Sutong Bridge     large units     lifting device     cantilever installation     lifting gantry     design and use    

Comparisons of bridges flutter derivatives and generalized ones

Fuyou XU , Zhe ZHANG , Cailiang HUANG , Airong CHEN ,

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 3,   Pages 272-278 doi: 10.1007/s11709-009-0042-1

Abstract: The causes of the nonlinearity of self-excited aerodynamic force of bridge are interpreted from suchThe graphs of the generalized flutter derivatives of plate and Sutong Bridge section model are plottedIt is more convenient to understand the nonlinearity properties of self-excited aerodynamic force of bridge

Keywords: bridge     flutter derivative     generalized flutter derivative     self-excited aerodynamic force     Sutong Bridge    

Title Author Date Type Operation

Brief description of project plan justification during the initial stage for main bridge of Sutong Bridge

Wu Shouchang, Xu Yingmei

Journal Article

Cultivating innovation capability of enterprise is an important task of Sutong Bridge construction

You Qingzhong

Journal Article

Practice and experience of engineering culture development in Sutong Bridge project

Yu Chunsheng,Yao Bei,Wang Qian

Journal Article

Design and construction of Sutong Bridge twoer

Luo Chengbin,Zhou Jianlin,Tian Wei,Daijie

Journal Article

and construction of scour protection for deep-water group pile foundation structures of two pylons in SutongBridge

He Ping,Guan Yijun,Zhang Xiongwen,Zhang Qun,Zhou Jianhua

Journal Article

Study on stuctural system of Sutong Bridge

Zhang Xigang,Pei Minshan,Yuan Hong,Xu Liping,Zhu Bin

Journal Article

Design and construction of Sutong Bridge deep-water main pylon foundations

Ren Huixing,Ouyang Xiaoyong,He Maosheng,Yang Hong,Sun Keqiang

Journal Article

The lowering as a whole technology of Sutong Bridge 5 800 t weigh steel cofferdam

Zhang Xiongwen,Ren Huixing

Journal Article

Challenge and Innovation in Sutong Bridge Foundation Proje ct

You Qingzhong,Dong Xuewu,Wu Shouchang

Journal Article

Assistant pullback technology for main span closure of Sutong Bridge

Chen Ming,Luo Chengbin,Wu Qihe,Zhang Yongtao,You Xinpeng

Journal Article

Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters

You Qingzhong,He Ping,Dong Xuewu,Zhang Xigang,Wu Shouchang

Journal Article

Structural stability analysis of Sutong Yangtze River Highway Bridge during construction

Zhao Lei,Li Qiao,Zhang Hong,BU Yizhi

Journal Article

Sutong Bridge--construction and control technology of the superstructure

Zhang Hong,Luo Chenbin,Zhang Yongtao,You Xinpeng

Journal Article

Research on the special lifting device for steel box girders of Sutong Bridge

Chen Ming,Wu Qihe,Luo Chengbin,Zhou Hanfa

Journal Article

Comparisons of bridges flutter derivatives and generalized ones

Fuyou XU , Zhe ZHANG , Cailiang HUANG , Airong CHEN ,

Journal Article